From Kitchen to Lobby Room Timeline
Here are all the before and after pictures of the Lobby Room from ‘Our 1930s Fixer Upper’
August 2016
May 2017
Work begins removing the old kitchen (part of the extension work)
May 2017
Work continues on the extension and the knock through from the old kitchen into the new extension.
August 2017
Work on the extension is finished, flooring laid and walls painted.
September 2017
The small Utility Room is finished (part of the side extension)
March/April 2019
We take part in Revamp Restyle Reveal and update the Lobby Room
Small Cushion made using Style Library fabrics
July 2020
Lockdown boredom results in re-painting and styling the Lobby Room for the final time.