Front Of House

Front of House Timeline

Here are all the before and after pictures of the front of ‘Our 1930s Fixer Upper’

 

August 2016

The week we moved in.

March 2017

Work starts on the single-story extension.

June 2017

Extension all finished.

January 2018

Windows changed at the front of the house

September 2018

House painted in ‘Tidy White’ by Valspar

March 2019

Front Door Changed from the old uPVC door back to an old wooden door with a custom made frame to match. The door was purchased on eBay for £30 and is the exact match of the original door style from the road.

September 2020

Driveway gets laid and front door painted in Farrow & Ball – ‘Off Black’

Porch Tiles – Mandarin Stone – Harlequin Range / Decor 8 and Black Base

Driveway Cobbles – Brett Landscaping / Alpha Trio / Professionally laid by Steve Gale of Abstract Building Co – Based in Berkshire – Tel 07803944312.